DESCRIPTION:
The project involved us digging a 4m shaft followed by18m of timber heading.
The heading was driven through 18m of hard rock, for a 300mm clay pipe sewer connection. While this represented a monumental challenge we have finished works within the times agreed, with a satisfied client and a massive ‘well done’ to our site team.
LOCATION:
Ashford, Kent
Ashford, Kent
CLIENT:
Erith Contractors
Erith Contractors